Positive Change with Carla : PMBOK 5.1 Plan Scope Management and PMBOK 5.2 Collect Requirements

posted in: Uncategorized | 0

Blogtalkradio

 

This Monday, February 22, 2016 is an all-new episode of Project Management Mondays which will cover the scope management knowledge area’s first two processes : PMBOK 5.1 plan scope management and PMBOK 5.2 collect requirements. Scope is one of the triple constraints (scope, cost and time) and the cornerstone of project management. PMBOK 5.1 contains two subsidiary project management plans: scope management plan and requirements management plan. In addition, there is the scope baseline containing the project scope statement, work breakdown structure (WBS) and WBS dictionary. PMBOK 5.2 covers the importance of collecting requirements.

Click on the show link to listen live: http://www.blogtalkradio.com/missphenomena/2016/02/22/pmbok-51-plan-scope-management-and-pmbok-52-collect-requirements

Click on this link to listen to all Positive Change with Carla past episodes:

http://www.blogtalkradio.com/missphenomena

Join the Carlarjenkins newsletter

Subscribe to get our latest content by email.

Powered by ConvertKit

Related Post

Leave a Reply